• A Configure the batch job to run during off-peak hours and set it to a lower batch thread priority.
  • B Schedule the batch job to run every hour to distribute the load throughout the day.
  • C Manually trigger the batch job during peak business hours.
  • D Increase the batch thread priority to the highest level to ensure it runs immediately.
  • Share this MCQ